Road
The roads adopt net system, all these roads are tar surface road, the width of the loads are 36 meter to 120 meter with sidewalk, green bush and street lamp.
The average level of the road are +2.6m, and the prepare wire¡¯s tube under the ground are 1.6m.
Power supply
At present, there is one substation in 110kV capacity and two substations in 3.5kV capacity.
Another new substation has been established and will be finishing construction at the end 2003, at that moment there will no power interruption in zone.
Water Supply
There are two water supply plants, the one is 30,000 cubic per a day and another one is 25,000 cubic per a day.
Sewage
The Zone are planning to establish a 3 level sewage treatment plant.
At present thetreatment capacity is 3 tons, the second stage will reach to 5 tons.
Drain
All the road has been spread drain system.
Heat Supply
There is a thermal power generation plant which the generating capacity is 25,000kV, and heat supply is 160 ton per hour, the pressure is 10Kg.
Communication
The telephone exchange has a capacity of 36,900 telephone set sand
IP telephone sets. And now we are innovating the broad band digital net system. |